T: +44(0)161 883 2247

E: office@aail.co.uk

Single Man Operation of the Drill Alignment System

This video was recorded during testing at a client site. Traditional systems require an operator inside the structure to hold the target in place during hole location and then remove it during drilling. The new target allows a single operator to position the target and then locate the hole and drill it. In conjunction with a multi- channel transmitter, the operator can place multiple targets within the structure, then move outside and locate and drill the holes sequentially giving further efficiency improvements.